Is Your Wind Turbine Project Stalled in Planning?
If you have a wind turbine project in planning in Scotland you could be experiencing delays. The fact is that the bigger the scale of your project the more difficult and demanding the planning and grid connection hoops to be jumped through.
Gaia-Wind can help.
If you’re medium wind project is getting bogged down in planning or connection, moving down in scale to a Gaia-Wind 133 -11kW turbine can turn a result in your favour...and still deliver a good ROI. This often only requires an amendment to the planning application which we will manage at no cost to you.
Designed for areas with an average annual wind speeds of between 10-17mph (4.5-7.5 m/s), the Gaia-Wind 133-11kW is ideally suited to sites with large open spaces such as farms, rural properties and rural businesses. The large rotor allows the
turbine to capture much more energy from the wind than similarly rated machines, delivering higher electricity production.
More than 500 Gaia-Wind turbines have been “in the ground” for a combined operational time of more than 14 million hours. That’s over 1,500 years! In Denmark, 77 of our Gaia-Wind turbines have been running for more than 10 years.
If you would like to discuss, please contact us.
Please add a comment
Leave a Reply
Got an enquiry about a news article, press release, or event?
Contact Gaia-Wind today by calling +44 (0) 845 871 4242, or email us for more information.
Gaia-Wind 133-11kw turbine
- High energy yield
- Feed in tariff eligible
- Reliable
- Safe
- Quiet
- Clean energy
![]()
-
January 1, 1970
-
January 1, 1970








